|
发表于 15-6-2012 18:55:17|来自:新加坡
来自手机
|
显示全部楼层
我同事用的contractor,貌似合理点:
Master Bath
1. To supply and install new floor tiles – overlay method. $600.00
2. To supply and install new water pipes. $300.00
3. To supply and install new instant water heater. $250.00
4. To supply and install a new 2-way tap. $50.00
5. To supply and install new WC (white colour). $400.00
6. To supply and install new aluminium frame bi-fold door. $250.00 |
|